DISINFECTION AND C.S 1400 CONNECTION CONTRACT

-       Pipe line preparation (Control valve-Air Valves-Washout..)

-       Cleaning hole pipe with salt water .

-       Fixing and replacing the damaged parts.

Filling the pipe line with chlorine and clean water until the water become disinfected as per the NWC standard.